Environmental Performance Indicators

AMD collects environmental data about AMD locations worldwide and direct manufacturing suppliers representing ~95% of total spend  , while making spend-based assumptions using CEDA factors for the remaining manufacturing and non-manufacturing suppliers. The following table provides data on energy use, electricity consumption, greenhouse gas (GHG) emissions, water use, waste generation and compliance. 

We received external limited level assurance in accordance with the International Standard on Assurance Engagements (ISAE) 3000 Revised for 2024 data on our Scope 1 and 2 GHG emissions and related performance against our CR goals, as well as Scope 3 GHG emissions for business travel.

Xilinx and Pensando data from the 2022 acquisitions are incorporated into the 2022 and 2023 metrics below. For 2020 and 2021 data, energy and Scope 1 and 2 GHG data from Xilinx and Pensando are included in support of recalculating base year 2020 and 2021 energy use and related operational GHG emissions.1

n/a = not available 
Values shown in italics represent adjusted data and are different from values shown in previous Corporate Responsibility Reports.

Energy
 2021202220232024
Total Absolute Energy Use (GJ)655,200748,800836,902951,831
Total Absolute Energy Use (GWh)182208233264
Atlanta52n/an/an/a
Austin25293242
Bengaluru56912
Cyberjaya<1<1<10
Dublin7787
Hyderabad 1791215
Hyderabad 2 (former Xilinx site)791010
Longmont14192123
Markham27283031
Milpitas34n/an/a
San Jose27333534
Santa Clara8111419
Shanghai11121414
Singapore 116182125
Singapore 2 (former Xilinx site)13131314
Other sites combined6101317
Electricity (Indirect Energy, GWh)161181203236
Atlanta52n/an/an/a
Austin25293241
Bengaluru45812
Cyberjaya<1<1<1<1
Dublin5555
Hyderabad 1791215
Hyderabad 2 (former Xilinx site)791010
Longmont13171921
Markham23242628
Milpitas33n/an/a
San Jose1718 1917
Santa Clara671017
Shanghai11121414
Singapore 116182125
Singapore 2 (former Xilinx Site)13131314
Other sites combined6101417
Total Renewable Electricity Use (GWh)34566 94118
% of Electricity Use Attributed to Renewable Sources28%37%46%50%
% of Energy Use Attributed to Renewable Sources25%32%40%44%
Atlanta02 n/an/an/a
Austin54 1930
Bengaluru45811
Dublin0555
Hyderabad 1791214
Hyderabad 2 (former Xilinx site)091010
Longmont00021
San Jose1718 194
Shanghai11121413
Other14  710
Total Non-Renewable Electricity Use (GWh)116115109118
Total Energy/Revenue (MWh/$USD Millions)411.18.810.310.3
Energy Use (Direct, GWh)21273029
Atlanta<12n/an/an/a
Austin<1<1<11
Cyberjaya<1  <1<1n/a
Dublin3233
Longmont2222
Markham4444
San Jose510151617
Santa Clara2442
Singapore 1<1 <1<1<1
Singapore 2 (former Xilinx Site)<1<1<1<1
Other sites combined<1<1<1<1
Energy consumption outside of the organization (GJ)6n/a210,247,200214,131,600209,433,600

 

Greenhouse Gas Emissions

Operational Emissions (Scope 1 and 2)

 20202021202220232024
Total Scope 1 Emissions7 (mtco2e)6,4126,4878,14510,00812,419
Atlanta4372<1<10
Austin93601141,7243,652
Bengaluru35111547898447
Boston0001000
Dublin708612418664550
Hyderabad 118221,065960730
Hyderabad 2 (former Xilinx site)1273228114
Longmont343279579560458
Markham883926857963909
Milpitas106106106n/an/a
San Jose3,0322,6623,3963,3334,130
Santa Clara321288378400371
Shanghain/an/an/a030
Singapore 1814781124261972
Singapore 2 (former Xilinx Site)5521611656
All other sites combined<1<1<1<1<1
Total Scope 2 Market-based Emissions8 (mtco2e)55,34249,39139,74536,59731,771
Atlanta02,1332n/an/an/a
Austin11,3688,36010,0765,2984,212
Bengaluru2,451025 0330
Cyberjaya158108106105124
Dublin1,2991,1422,30600
Hyderabad 14,1900088304
Hyderabad 2 (former Xilinx site)4,5475,09600110
Longmont6,8007,4419,08010,119151
Markham2,5822,8203,001730833
Milpitas563578733n/an/a
San Jose5,1095,147003,105
Santa Clara1,2151,2471,7992,5283,810
Shanghai0000451
Singapore 16,4436,3006,8388,2659,493
Singapore 2 (former Xilinx site)4,8054,9803,5032,3672,832
All other sites combined3,8124,0392,2787,0976,017
Total Scope 1 and 2 Market-based Emissions (mtco2e)61,75455,87847,89046,606 44,190
Scope 1 and 2 Market-based Emission Reductions9 (% reduction from 2020)n/a9.5%22.5%24.5%28%
Scope 1 and 2 Market-based Emissions/Revenue (Scope 1 and 2 mtco2e/$USD millions)46.33.42.02.02.0
Total Scope 2 Location-based Emissions10 (mtco2e)68,49470,65974,47980,83991,579
Atlanta11,1832,1182n/an/an/a
Austin10,7539,8209,06011,97514,299
Bengaluru2,6463,0843,6675,5418,520
Cyberjayan/an/an/a105124
Hyderabad 14,5254,8376,1248,75210,707
Hyderabad 2 (former Xilinx site)n/an/a6,1377,2027,443
Longmont5,6696,9899,0129,89710,787
Markham2,7432,5862,923730833
San Josen/an/a3,7763,8742,938
Santa Clara1,2111,2241,8002,4993,781
Shanghai5,9296,8857,6058,4268,366
Singapore 16,4836,1826,8488,2659,493
Singapore 2 (former Xilinx site)n/an/a4,9604,4085,424
All other sites combined17,35226,93412,5679,1658,863
Total Scope 1 and 2 Location-based Emissions (mtco2e)74,90777,14882,62490,848103,998
Scope 1 and 2 Location-based Emissions/Revenue (Scope 1 and 2 mtCO2e/$USD million)47.74.73.54.04.0

 

Scope 3 Emissions

 2021202220232024
Estimated Scope 3 Emissions (mtco2e)1112,812,87226,401,53523,126,77418,281,832
Category 1: Purchased goods and services3,744,6044,019,6203,909,3473,950,348
Category 3: Fuel-and energy-related activities (not in Scope 1+2)14,49019,75017,00412,346
Category 4: Upstream transportation and distribution61,17580,94790,70292,434
Category 5: Waste generated in operations4179260331
Category 6: Business travel67110,77913,98533,467
Category 7: Employee commuting7,37033,24735,05239,071
Category 11: Use of sold products8,983,02522,236,4841219,059,59814,152,933
Category 12: End of Life treatment of sold products1,496630825903
Total Estimated Scope 3 Emissions Per Revenue (mtco2e / USD $ Millions)47801,116959709
Other Emissions
 2021202220232024
NOx Emissions (metric tco2e)n/an/a2629
SOx Emissions (metric tco2e)n/an/a0.60.7
GHG-HCFC-22 (metric tco2e)n/an/a384122

 

Water
 2021202220232024
Total Water Withdrawal(million liters)7513183225267
Atlanta52n/an/an/a
Austin551438
Bengaluru2355
Cyberjayan/an/an/an/a
Dublinn/a91310
Hyderabad38910
Hyderabad 2 (former Xilinx site)n/a41111
Longmontn/a724676
Markham24194026
San Josen/a202626
Santa Clara12121821
Shanghai15141819
Singapore81098
Singapore 2 (former Xilinx site)n/a689
Other sites combined<1198
Water Use/Revenue (ML/$USD millions)40.0050.0080.0100.010
Contract Wafer Manufacturing Water Use (ML)1411,06912,65712,50511,091
Contract Wafer Manufacturing Water use / Revenue (ML/USD millions)40.670.540.550.43
Waste
 2021202220232024
Total Non-Hazardous Waste (NHW) Generated (metric tons)4527851,2681,455
Atlantan/a2n/a20156
Austin163182190186
Bengaluru2212149
Dublinn/a294559
Hyderabad51546115
Longmontn/a555757
Markham226211468526
San Josen/a180285303
Santa Clara28373459
Singapore 123313854
Singapore 2 (former Xilinx site)n/a152521
Other sites combined523921
NHW Recycled (metric tons)383622755784
NHW Landfilled (metric tons)69135461596
NHW Incinerated (metric tons)n/a282934
NHW Treated (metric tons)n/an/a2241
NHW Landfill Diversion Rate (%)85%83%63%57%
Total Hazardous Waste (HW) Generated (metric tons)42480108
Austin2257
Bengalurun/an/a17
Hyderabadn/an/a2020
Hyderabad 2 (former Xilinx site)n/a12212
Markham1<111
Santa Clara<12<11
Singapore 1<185055
Singapore 2 (former Xilinx site)n/a<111
Other sites combinedn/a<1<16
HW Recycled/Reused (metric tons)<1122433
Amount of HW waste from manufacturing, % recyclen/an/a97%100%
HW Treated Off-Site (metric tons)185056
HW Incinerated (metric tons)1235
HW Landfilled (metric tons)2235
Total Waste Generated (NHW+HW) (metric tons)4558091,3481,564
Total Waste Generated per Revenue (metric tons/$USD millions)0.030.030.060.06
Contract Wafer Manufacturing HW Generated (metric tons)1444,36247,01844,29260,025
Contract Wafer Manufacturing HW Generated per Revenue (metric tons/$USD millions)42.701.991.952.33
Wastewater
 2021202220232024
Total Wastewater Discharge[i] (million liters)163161837
Austin33725
Longmontn/a121112
Wastewater generated per Revenue (ML/$USD Millions)40.00020.00070.00080.0015
Compliance
 2021202220232024
Number of Environmental Non-Compliances00117218
Fines (USD)00$8,072$3,000

Social Performance Indicators

The following tables provide annual data on our global workforce including employee diversity, new hires, employee turnover, parental leave, career development, training, well-being and volunteerism.

n/a = not available
Values shown in italics represent adjusted data and are different from values shown in previous Corporate Responsibility Reports.

Global Workforce Data
(Headcount, year-end)2021202220232024
Total Workforce1922,45634,64835,29439,691
Total Employees15,50324,52525,76828,343
Temporary Workers and Contractors6,95310,1239,52611,348
Employees By Region
Americas8,18511,98912,59013,774
% in Americas52%49%49%49%
EMEA3891,4781,5462,003
% in EMEA3%6%6%7%
Asia-Pacific/China/Japan6,92911,05811,63212,566
% in Asia-Pacific/China/Japan45%45%45%44%
Temporary Workers and Contractors by Region
Americas1,7812,2711,9772,378
% in Americas26%22%20%21%
EMEA430613721739
% in EMEA6%6%8%6.5%
Asia-Pacific/China/Japan4,7427,2396,8288,231
% in Asia-Pacific/China/Japan68%72%72%72.5%
Employees by Gender
Male11,73418,74419,70321,737
% of male76%76%76%77%
Female3,7695,7806,0646,605
% of female24%24%24%23%
Genderqueern/a111
% of genderqueern/a<1%<1%<1%
Employees by Age Group
iGen(born 1997 or later)5641,6482,3463,305
% of iGen4%7%9%12%
Millennials (born 1981-1996)8,49813,33613,97315,402
% of Millennials55%54%54%54%
Generation X (born 1965-1980)5,3047,9307,9678,255
% of GenX34%32%31%29%
Baby Boomers (born 1946-1964)1,1361,6101,4811,381
% of Baby Boomers7%7%6%5%
Traditionalists (born 1927-1945)1110
% of Traditionalist<1%<1%<1%0%
Employees by Work Status
Full-Time Employees15,48024,47525,72628,295
% of FTE99.9%99.8%99.8%99.8%
Part-Time Employees23504248
% of PTE<1%<1%<1%<1%

Additional Workforce Disclosures

Gender Pay Gap Report - Xilinx Ireland Unlimited Company

AMD EEO-1 Reports:

WGEA Gender Equality Group Report - AMD Australia:

Employee Category by Gender
(Headcount, year-end)2021202220232024
AMD Executive Team21
Male11 131917
% of male79% 81%83%77%
Female3 345
% of female21% 19%17%23%
Genderqueern/a000
% of genderqueern/a0%0%0%
Senior Management22
Male6121,2171,3361,416
% of male84%86%86%86%
Female115191219227
% of female14%14%14%14%
Genderqueer0000
% of genderqueer0%0%0%0%
Engineering
Male10,03615,85416,82718,803
% of male80%81%81%81%
Female2,4563,7013,9804,452
% of female20%19%19%19%
Genderqueer0111
% of genderqueer0%<1%<1%<1%
Diversity of Board of Directors
(Headcount, year-end)2021202220232024
Total number of Board of Directors8999
Generation X (born 1965-1979)
Total Male1111
% of male13%11%11%11%
Total Female1111
% of female13%11%11%11%
Baby Boomers (born 1946-1964)
Total Male5555
% of male63%56%56%56%
Total Female1222
% of female13%22%22%22%
Women in Management
(Headcount, year-end)202220232024
% of Women in Managementn/a19%18%
% of Women in Middle Managementn/a20%19%
% of Women in Non-Managerial Positionsn/a25%24%
New Employee Hires and Employee Turnover
(Headcount, year-end)2021202220232024
Total New Employee Hires & Acquisitions4,34111,2783,0584,474
New Hires as % of Prior Year Employee Count34%73%12%17%
New Hires Distribution by Region
Americas1,9354,9261,4882,004
% of Americas45%44%49%45%
EMEA1681,199268608
% of EMEA4%11%9%13%
Asia-Pacific/China/Japan2,2385,1531,3021,862
% of Asia-Pacific/China/Japan51%45%42%42%
New Hires by Gender
Male3,2468,7572,3623,453
% of male75%78%77%77%
Female1,0952,5206961,021
% of female25%22%23%23%
Genderqueer0100
% of genderqueer0%<1%0%0%
New Hires by Age Group
iGen (born 1997 or later)4221,2258571,182
% of iGen10%11%28%26%
Millennials (born 1981-1996)2,8696,2691,5812,446
% of Millennials66%56%52%55%
Generation X (born 1965-1980)9163,159542769
% of GenX21%28%18%17%
Baby Boomers (born 1946-1964)1346257777
% of Baby Boomers3%5%2%2%
Traditionalists (born 1927-1945)0010
% of Traditionalist0%0%<1%0%
Terminations
Total Terminations1,4722,2511,8051,892
Total Turnover Rate (%)2310.6%10.6%7.2%7.0 %
Voluntary Turnover Rate24 (%)9.5%9.5%4.1%4.3 %
Other Turnover Rate251.1%1.1%3.1%2.7 %
Male Voluntary Turnover Rate (%)9.7%9.6%4%4.2 %
Female Voluntary Turnover Rate (%)8.7%9.1%4.3%4.5 %
Turnover Rate by Gender
Male1,1571,7401,3951,430
% of male11.0%10.7%7.3%6.9 %
Female315511410462
% of female9.5%10.1%6.9%7.3 %
Genderqueer0000
% of genderqueer0%0%0%0%
Turnover Rate by Region
Total in Americas6561,146907822
Turnover rate (%) in Americas8.7%10.8%7.4%6.2%
Total in Asia-Pacific/China/Japan802995712927
Turnover rate (%) in Asia-Pacific/China/Japan13.2%10.4%6.3%7.6%
Total in Europe/Africa14110186143
Turnover rate (%) in Europe/Africa4.8%10%12.7%8.3 %
Total Turnover Rate by Age Group
Total number of iGen (born 1997 or later)22141158222
Turnover rate (%) of iGen (born 1997 or later)6.6%12.3%7.9%7.7%
Total number of Millennials (born 1981-1996)9851,4269451,019
Turnover rate (%) of Millennials (born 1981-1996)13.3%12.3%7%6.9%
Total number of Generation X (born 1965-1980)344533498475
Turnover rate (%) of Generation X (born 1965-1980)6.9%7.6%6.3%5.8%
Total number of Baby Boomers (born 1946-1964)120151203175
Turnover rate (%) of Baby Boomers (born 1946-1964)10.5%10.2%13.1%12.1%
Total number of Traditionalists (born 1927-1945)1011
Parental Leave26
(Headcount, year-end)2021202220232024
Employees that were entitled to parental leave27
Male11,73418,77019,70421,740
Female3,7695,7596,0636,604
Genderqueer0011
Total15,50324,52925,76828,345
Employees that took parental leave
Male2005499501,025
Female227304485519
Genderqueer0000
Total4278531,4351,544
Employees that returned to work in the reporting period after parental leave  
Male187531896977
Female206239397504
Genderqueer0000
Total3937701,2931,481
Employees that returned to work after parental leave ended that were still employed 12 months after their return to work
Male183507880947
Female199229391486
Genderqueer0000
Total3827361,2711,433
Return to work rates of employees that took parental leave (%)
Male return to work rate (%)94%97%94%95%
Female return to work rate (%)91%79%82%97%
Genderqueer return to work rate (%)0%0%0%0%
Total return to work rate (%)92%90%90%96%
Retention rates of employees that took parental leave (%)
Male retention rate (%)92%92%93%92%
Female retention rate (%)88%75%81%94%
Genderqueer retention rate (%)0%0%0%0%
Total retention rate (%)89%86%89%93%
Performance and Career Development28
(Headcount, year-end)2021202220232024
Employees by gender who received a regular performance review during the reporting period.
% of male98.7%100%100%100%
% of female98.2%100%100%100%
% of genderqueer0%100%100%100%
Employees by employee category29 who received a regular performance review during the reporting period.
% of Executive92.8%100%100%100%
% of Managers99.4%100%100%100%
% of Technical Staff99.0%100%100%100%
% of Staff98.6%100%100%100%
Minimum Wage30
Annual Salary (USD)2022120232024
Lowest U.S. entry-level wage$35,292$38,468$40,103
Training and Education
(Headcount, year-end)202220232024
Total hours of employee training178,944156,561166,994
Average hours of training per year per employee7.365.9
% of the total employees across all locations who received career or skills-related training31n/a26%23%
% of the total workforce across all locations who received training (internally or externally) on environmental issues32n/a67%75%
AMDer Survey
(Headcount, year-end)2021202220232024
% of employees that responded96%96%95%93%
I am proud to work for AMD (% favorable)94%92%91%91%
I would recommend AMD as a great place to work (% favorable)86%86%83%88%
AMD creates an environment where people of diverse backgrounds can succeed (% favorable)92%92%92%92%
Engagement Index (% favorable)86%86%86%86%
Belonging and Inclusion Index (% favorable)90%90%89%91%
Manager Quality Index (% favorable)88%89%88%87%
Well-Being33
 2021202220232024
Number of Recordable Combined Injury and Illness Cases8121410
Rate of Recordable Combined Injury and Illness Cases (per 200,000 work hours)0.040.040.040.03
Number of Recordable Injury Cases431410
Rate of Recordable Injury Cases (per 200,000 work hours)0.020.010.040.03
Number of Recordable Employee Injury Cases421110
Rate of Recordable Employee Injury Cases (per 200,000 work hours)n/an/an/a0.03
Number of Recordable Contractor Injury Cases0130
Rate of Contractor Recordable Injury Cases (per 200,000 work hours)n/an/an/a0
Number of Recordable Illness Cases4900
Rate of Recordable Illness Cases (per 200,000 work hours)0.020.0300
Number of Recordable Employee Illness Cases2900
Number of Recordable Contractor Illness Cases2000
Number of Employee Work-Related Fatalities0000
Number of Contractor Work-Related Fatalities0000
Number of Combined Employee and Contractor Work-Related Fatalities0000
Rate of Combined Employee and Contractor Work-related Fatalities (per 200,000 work hours)0000
Number of Employee High-Consequence Work-Related Injuries (excluding fatalities)0000
Rate of Employee High-Consequence Work-Related Injuries (excluding fatalities) (per 200,000 work hours)0000
Number of Contractor High-Consequence Work-Related Injuries (excluding fatalities)0000
Rate of Contractor High-Consequence Work-Related Injuries (excluding fatalities) (per 200,000 work hours)0000
Rate of Combined Employee and Contractor High-Consequence Work-Related Injuries (excluding fatalities) (per 200,000 work hours)0000
Number of Days Lost Due to Employee Injuriesn/an/an/a33
Lost Time Injury (LTI) Severity Rate for Employees (per 1,000)n/an/an/a0
Number of Days Lost Due to Contractor Injuriesn/an/an/a0
Lost Time Injury (LTI) Severity Rate for Contractors (per 1,000)n/an/an/a0
Total Number of Hours Worked38,583,38459,955,00074,238,69666,313,704
Number of Employee Hours Workedn/an/an/a60,007,176
Number of Contractor Hours Workedn/an/an/a6,306,528
Total Lost Time Eventsn/an/an/a1
Number of Employee Lost Time Eventsn/an/an/a1
Number of Contractor Lost Time Eventsn/an/an/a0
Employee Lost Time Injury (LTI) Frequency Rate (per 1,000,000)n/an/an/a0.02
Contractor Lost Time Injury (LTI) Frequency Rate (per 1,000,000)n/an/an/a0
Number of Health or Safety Non-Compliances134135336137
% of the total workforce represented in joint management-worker health and safety committeesn/an/a28%29.5%
Total amount of monetary losses as a result of legal proceedings associated with employee health and safety violationsn/an/a$0$0
% of AMD Managed Sites for which an EHS risk assessment has been conductedn/an/a30%44%
Volunteerism38
 2021202220232024
AMD Volunteers2,8074,9775,7208,178
AMD Volunteer Hours9,05217,24425,36833,388
Number of Volunteer Events64162288358
Number of Employee Donorsn/a1,8884,1676,424

Economic Performance Indicators

The following tables provide information about our company’s annual financial data, social investments and U.S. political activities.

n/a = not available
Values shown in italics represent adjusted data and are different from values shown in previous Corporate Responsibility Reports.

Financial Data39
 2021202220232024
Total Revenue (millions USD)$16,434$23,601$22,680$25,785
Operating Expense (millions USD)$4,293$9,441$10,093$10,873
Community Investments
 2021202220232024
By Type
AMD Foundation - Charitable Grants (USD)$32,500$101,388$10,000$400,000
Cash and In-Kind Giving (USD)$1,814,847$5,042,084$5,020,122$6,845,327
Matching Gift and Volunteer Reward (USD)n/a$961,178$1,689,672$1,758,312
Total (USD)$1,847,347$6,104,650$6,719,794$9,003,639
By Region40
Total Americas (USD)$1,205,217$3,715,629$2,908,785$5,211,578
Total Europe/Africa (USD)$156,935$990,436$906,152$1,387,400
Total Asia-Pacific/Greater China/India (USD)$485,195$437,408$1,215,185$646,348
By Focus Area40
Total Education (USD)$294,172$678,860$923,910$1,454,393
Total Disaster relief and humanitarian aid (USD)$125,000$135,500$0$52,632
Total Social Services (USD)$445,077$224,126$376,544$339,421
Total Scientific Research (USD)$955,653$4,040,005$3,643,973$5,291,014
Total Environment (USD)$27,445$64,982$85,695$107,867
Advanced Micro Devices, Inc. Political Action Committee (PAC)41
 2021202220232024
Total Contributions (USD)$11,250$36,500$33,000$82,120
Total Receipts (USD)$31,000$62,465$6,000$37,500
Notas de rodapé
  1. 2020 and 2021 data includes energy use and Scope 1 and 2 GHG emission data from Xilinx and Pensando in order to reset the 2020 GHG goal baseline per the GHG Protocol, but does not include other data (i.e., water, waste) from the acquisitions in those years. All 2022 and later year environmental metrics include Xilinx and Pensando data. 
  2. AMD migrated US data center operations near Atlanta to a third-party operated, collocated facility .
  3. AMD sources renewable energy through utility providers (green tariffs), and sellers of third-party certified renewable energy credits (RECs), as well as generates renewable energy onsite
  4. For financial intensity metrics, AMD reports the environmental metric and divides by the corresponding year annual revenue (in millions of USD). Energy use is MWh of energy per $1M USD revenue, and the 2020 and 2021 revenue reflects AMD prior to the acquisitions although energy use is included from the acquisitions due to the 2020 base year reset for our GHG reduction goal.  Emissions financial intensity is metric tCO2e per $1M USD in revenue, shown both for location-based and market-based scope 2 emissions. Water use and wastewater discharge are reported as millions of liters of water used or discharged per $1M USD in revenue. 
  5. San Jose has fuel cells that convert diesel into electricity. The emissions related to the fuel cells are reported under Scope 1. The site also generates renewable energy onsite, which is included in the site electricity use but assigned a zero emission factor. 
  6. AMD reported data for “Energy outside of the organization” includes purchased goods and services (category 1) and use of goods sold (category 11). 
  7. AMD follows the GHG Protocol for Scope 1 emission estimates, the internationally recognized standard for the corporate accounting and reporting of GHG emissions. Scope 1 emissions factors estimated based on quantity of refrigerants and fuel consumed in each geography, including natural gas and refrigerants such as hexafluoroethane (HFE) and hydrofluorocarbons (HFCs). The scope is based on operational control (i.e., AMD occupied facilities) and the method includes Site Metrics Coordinators entering the monthly amount of fuel and chemicals use, by type, into AMD’s central database, and then applying the emission factors. Emission factors were obtained from three main sources: DESNZ 2024 (previously referred to as DEFRA or UK BEIS in previous documents), IPCC AR6 (6th Assessment Report) or US EPA Fluorinated GHG Report.) Values have undergone third-party limited assurance.
  8. AMD follows the GHG Protocol for Scope 2 emission estimates by multiplying the quantity of electricity consumed at each site by relevant emission factors. If electricity use data is not available, as for small offices, then an average value for U.S. office buildings is used for all AMD locations (16.9 kWh/sq ft) based on EIA CBECS results for the average administrative office, and the emission factor for the location is applied. AMD applies both the market-based and location-based methods for estimating scope 2 emissions. Market-based emission calculations are based on grid electricity use excluding renewable energy sourced through green tariffs and renewable energy credits (RECs) allocated to each site. Location-based emission calculations are based on the quantity of grid electricity used plus renewable energy sourced through utility “green tariff” programs. Emission factors for locations in the U.S. are based on eGRID and Green-e 2023 databases. Location-based electricity emission factors for Canada are provided in the 2024 Canada NIR report, specific to each Canadian province. Market-based emission factors for Europe were taken from the IEA 2024 emission factor database. Location-based emission factors for all countries other than the US and Canada were taken from the IEA 2024 emission factor database. 2020-24 values have undergone third-party limited assurance.
  9. Our goal is a 50 percent reduction in absolute Scope 1 and 2 GHG emissions from 2020-2030.
  10. Some site location-based GHG emission values for Xilinx and Pensando sites in 2020-21, prior to acquisition by AMD, are estimates under 'other site' approximations.
  11. In 2021, AMD expanded the estimations for scope 3 reporting, thereby notably increasing total values reported those years. Our value chain emissions are estimated following the guidance from the GHG protocol. Category 1: Emissions are calculated by directly surveying suppliers representing ~95% of our total supply chain spend (includes Foundry, final test/assembly, substrates). It includes their estimated allocations to AMD (typically using revenue-based accounting), at a factory level where available, for their Scope 1 and 2 emissions, as well as upstream Scope 3 if available. For Foundries, we used a third-party life cycle assessment to estimate upstream emissions. For other suppliers we apply a spend-based method by mapping spend categories to the associated Scope 3 CEDA emission factor. Emissions from all other vendors (including marketing, professional services, real estate, software providers, telecom and networking providers and other manufacturing services) are calculated using a spend-based method. Category 2: Calculated following a spend-based method and are included in the disclosed figure in Category 1. Category 3: Emissions are calculated using fuel and electricity consumption data collected from our sites globally, and Well-to-tank (WTT) emission factors for natural gas and diesel were obtained from the DEFRA 2024 Conversion Factors database. Emission factors for transmission & distribution-related electricity losses, and electricity-related WTT generation and transmission and distribution, were obtained from the IEA Emission Factors 2024 database and the IPCC AR5 report. Category 4: emissions are estimated using a hybrid methodology combining supplier-specific emissions reported by two of our major shipping providers and a mode-specific, spend-based calculation on all other logistics spend. Category 5: Waste data is collected from our sites globally. End-of-life, disposal method-specific emissions factors were obtained from the 2024 DESNZ Conversion Factors database. A recycling emission factor was obtained from the 2021 DESNZ Conversion Factors database. Category 6: Emissions were calculated in accordance with the GHG Protocol based on commercial and private jet air travel data and spend data provided by our travel agencies. Flights were categorized as either short-, medium-, or long-haul and the appropriate DESNZ 2024 factors are applied. For car rental and train travel, we used spend-based estimates from the CEDA 5.0 EEIO database. Category 7: Emissions are based on 2025 employee survey data. Offices were split into geographic regions, and commuting benchmarks were calculated per these regions (EMEA, North America, South Asia, East Asia/Southeast Asia.) The commuting modes were cycling/biking, van transport, public transport, and driving alone. Public transport was assumed to be a mix of train and bus travel, as determined by regional benchmarks outlined in the commuting tool descriptions below. All employees were assumed to work 250 days with an assumption applied for full time onsite versus part time (hybrid) versus remote.  Data for 2021-2023 included the~10 largest campuses whereas 2024 included all employees globally. Category 11: Emissions are calculated based on total sales volume, average product electricity consumption, and average product lifetime split by product category for products sold in the reporting year. Emissions were calculated by multiplying total energy consumption by the corresponding country-level emission factor from IEA 2024. A percentage of data center-related products are assumed to be powered with renewable electricity based on public reporting from our customers. Since 2022, data has included Xilinx products. Category 12: Emissions are calculated based on the average product weight by product category and the total sales volume within the reporting year. A weight-based calculation is used, with the disposal method estimated using region-specific e-waste disposal benchmarks obtained from the Global e-Waste Statistics Partnership (2024). Region-specific waste disposal benchmarks obtained from the World Bank. Disposal type-specific emission factors obtained from the EPA GHG Emission Factor Hub (2024). Region-specific blended average waste disposal emission factors were calculated using waste disposal benchmarks.
  12. In 2023, AMD restated estimated 2022 product use and end of use estimates (Scope 3 categories 11 and 12) to include Xilinx and Pensando data following 2022 acquisitions.
  13. The low water use in 2021 was attributed to several factors including having fewer employees on-site due to COVID-19 protocols.
  14. AMD receives estimated data on from our primary wafer foundries on energy use, GHG emissions, water use, hazardous and non-hazardous waste attributed to the manufacturing of AMD products.
  15. AMD moved its data center operations from Atlanta in 2021 to a collocated facility but decommissioned server and other equipment in 2023 and 2024. 
  16. AMD generates a limited amount of wastewater that requires treatment by the municipal wastewater treatment plant, in accordance with water quality permitting.
  17. On 12/14/2023, the City of Markham performed an unannounced McNabb construction site visit and notified AMD of a failure to meet the “Tree Preservation By-Law.” An approved permit and protection barriers were needed prior to beginning outdoor work laying conduit and the construction contractors failed to comply. The City required an arborist to inspect the trees and provide a tree impact report. The arborist, hired by the construction company (DPI), came to the site on 12/16/2203 and provided a report to the City which stated that three trees (each 14 inch+ in diameter) were severely damaged and will need to be removed. The City required AMD to remove the three trees by Jan 31, 2024, and gave an option of planting 18 trees or pay a fine of USD$10,800 (USD$600 for each tree not planted) by May 31, 2024. An arborist (hired by DPI) removed the trees on January 24, 2024. After discussion with the property owner, AMD opted to replace three trees and pay cash in lieu for fifteen. Action of tree removal was confirmed by the City on January 26, 2024, and cash in lieu on April 17, 2024. The City confirmed compliance via email on May 9, 2024.
  18. A stormwater inspection at San Jose found two environmental issues related to outdoor cleaning which were quickly fixed and a follow-up inspection confirmed all concerns were resolved. A notice of violation and a USD$3,000 settlement offer were received from the San Francisco Bay Regional Water Quality Control Board regarding a xylene exceedance in groundwater associated with the AMD Superfund site. Despite evidence that there was no bypass, violation or unauthorized discharge, AMD decided not to contest the violation and paid the fine. An inspection by the San Jose Fire Department noted missing signage. Temporary signs were placed during the inspection and permanent signs were installed shortly thereafter.
  19. Reported data includes AMD employees, temporary workers and contractors.
  20. Genderqueer was added as a new category for employees to self-identify gender beginning in 2022.
  21. AMD Executive Leadership Team (c-suite).
  22. Includes People Managers that are in the Director or Fellow level positions and above. Reported employee data exclude unknown gender.
  23. Number of total terminations divided by the average monthly regular headcount throughout the year.
  24. Voluntary terminations are defined as the number of regular employees leaving AMD voluntarily, excluding retirements.
  25. Other turnover rate (%) is defined as the number of other terminations divided by the average monthly regular headcount throughout the year. Other termination reasons include involuntary, RIF, death, and retirement.
  26. Based on employees who were on LOA Parental / Maternity with a start date in that year and if returned to work after the LOA end date (with Voluntary or Family reasons). Reported data is for AMD employees. 
  27. AMD offers paid parental leave globally to its FTE employees. “Parental leave” can encompass various types of leaves in different countries; it provides time off for parents to nurture their families and make necessary life adjustments.
  28. Includes AMD employees hired on or before September 30th of the reporting year.
  29. Employee categories are defined as Executive: Director level positions and above; Manager: Manager and Senior Manager Job Titles; Technical Staff: Member of Technical Staff through Corporate Fellow; Professional: Supervisor positions; and Staff: Employees from Junior level positions to Professional.
  30. AMD employee base pay is benchmarked to the competitive high-tech market of companies our size, with our midpoint targets at or above the median of the market.
  31. Reported value is based on the total number of employees across all locations who received career- or skills-related instructor led training - excluding compliance, functional specific, or eLearning trainings.
  32. Reported value is calculated based on the number of employees that complete the AMD Global HSSE Workplace Orientation training during the reporting period.
  33. The reported data includes AMD employees and contract workers who report directly to an AMD employee. Our reporting guidelines are based on OSHA reporting criteria. Minor (first aid level) injuries are not included. Lost days are calculated based on scheduled workdays. The scope of our wellbeing (health and Safety) reporting was expanded in 2024 to include additional metrics and categories. Consequently, some data for prior years is not available for comparison.  
  34. On April 28, 2021, a Notice of Violation was received from the Austin Fire Department for a small site in Austin. Two deficiencies were noted, one for the failure of a heat detector and the other for inability to inspect two other detectors. All corrective actions were completed, and the site was back in compliance on May 4, 2021.
  35. A missing placard was identified during a San Jose Fire Department hazardous materials inspection at the San Jose site. A placard was posted, and the agency confirmed the violation was resolved.
  36. California Department of Public Health issued an NOV on July 6, 2023, for missing signage on X-ray equipment at the San Jose site. Signs were added and NOV was closed on Aug 8, 2023. The San Jose Fire Department issued two NOVs in November 2023 for delayed submittal of fire alarm inspections. The information was submitted, and the NOV was closed on December 1, 2023.
  37. An inspection by the San Jose Fire Department noted missing signage. Temporary signs were placed during the inspection and permanent signs were installed shortly thereafter.
  38. Reported data includes AMD employees and contractors.
  39. Economic data for current and past years are updated annually to reflect the company’s most recent financial reports.
  40. Reported data by region and focus area excludes Matching Gift and Volunteer Rewards.
  41. The AMD PAC is 100% funded by personal contributions from eligible donors, which include certain employees and their spouses, and is used to support candidates running for public office. AMD cannot, and does not, make any direct or indirect financial contributions to federal political candidates or committees. Totals of U.S. contributions and receipts associated with the AMD PAC are available on the U.S. Federal Election Commission website. Additional information on AMD Public Policy Engagement and U.S. Political Activities can be found here: https://www.amd.com/en/corporate/corporate-responsibility/governance/public-policy-engagement.html.